Testing Update [Week 1, Nov]

Dear IVIers,

You probably have been looking forward to this update since last Friday. In fact, the testing is more time-consuming than we expected. Please check what we have accomplished so far:

1. Rigidity test of the main frame

The rigidity of the main frame is one of the few core parts that will have a direct and obvious impact on print quality. With it been verified, we can be more confident that the overall print quality is guaranteed to reach an average level and we can fine-tune other parts to reach above the average. Also, after its confirmation, we can prepare the mold making of the key components, including the columns and the joint rings. So we sent the printer to a third-party testing organization to be tested. By comparing the deformation of the frame under 15kg loads and zero load, we found that the deformation is close to our theoretical analysis, which means that the main frame passed the rigidity test.

3D Scanning with 15kg loads

3D Scanning without load

Reference data

Measured data

Comparison

2. Strength and deformation test of the carbon rod

The strength of the carbon rod and its deformation under certain stress is another factor that will affect the FDM, Laser, and CNC functions, with CNC function being the main one as it has a higher requirement for the carbon rod. We tested 6mm, 7mm, 8mm carbon rods, each with 2 types. From the result, we conclude that type A of the 7mm carbon rod is suitable to be used. This is decided by the maximum motion resistance that the print head can withstand. This choice will be verified in the following integrative test again.

Test result

3. Magnetic damping ratio test of the magnet steel

To confirm that the cobalt oxide magnetic steel mounted on the PCB heat bed can work well for bonding even after long hours of high-temperature printing, we tested the magnetic steel separately. We tested hardened cobalt oxide magnetic steel, ordinary cobalt oxide magnetic steel, and ordinary magnetic steel. Each group has 10 pieces. Ordinary magnetic steel works as the control group. We tested 3 times at 160°C, each with 8 hours, 14 hours and 10 hours separately. Judging from the result, we are going to use hardened cobalt oxide magnetic steel as its degaussing is not obvious after the test.

Test result #01

Test result #02

Test result #03

Also, from where we are standing at the moment, below are the schedule for the coming few months.

  • Assemble & testing of the 4 new prototypes, 1 month – end of Nov (Apply for FCC/CE/RoHS, Start package design);
  • Trial production & testing of 20 units, 1.5 months – early of Jan;
  • Trial production & testing of 100 units, 1.5 months – end of Feb 2020.

We will keep updating this schedule and keep sharing the progress and problems along the way.

More tests are being conducted and the results will be shared with you soon. Looking forward to receiving feedback from you as always!

4 Likes

Are we going to see any update from week 2/3?

Hi @Techdragonz, sorry for the delay. The testings we conducted in the last two weeks were limited, and so we were waiting for more progress on the testing to show you. Some testings are postponed due to the optimization of key parts. We found some parts cannot meet our requirements on the performance and some parts are difficult to install, thus we optimized the design to reduce the difficulty of process. Now we are waiting for all the upgraded parts coming in (23th, November) and then resume the testing. On the other hand, according to the verification from professionals, we made some modification on the parts need to be molded and discuss details with molding factory. Also, we made some achievements on the cloud-slicer and operation system. We will publish an update in detail soon.

1 Like

Any update on receiving the parts? How’s the testing coming along?

Hi IVI,

Any update news on where we are with testing? Secondly, with having to order yet again more new modified parts will this impact on the delivery schedule you proposed last month?

There seems to be more and more delays as we get closer to the delivery date, can we expect a postponement of deliveries due January/February 2020 or are we on task to deliver to backers?

Please let us know…

Regards
Robin.

1 Like

Along with an update on January/February delivery targets, also needed is an update on production past those first 120 units.

There were nearly 2500 backers (thats how IVI took in 1.3M dollars from their kickstarter), so 120 units barely scratches the surface.

Hi, @DonFL I am so sorry for the late reply. Yes, a plan on the rest of the units is necessary. At the moment, we want to make sure that we can keep the deadline for the 120 units first before we can confidently announce a timeline for the rest of the units.

1 Like

Hi @rlb-designs, sorry for the late reply. Did you check our latest update published last week? We are not sure if the recent progress will have an impact on the timeline yet. According to the newest timeline, trial production & testing of 120 units are planned at the end of Feb 2020. If there are changes that will affect the timeline, we will synchronize the timeline and announce it as soon as possible.

1 Like